When the earth in the construction area is not solid it is a method of construction in order to provide a stability for reaching the solid earth by a vertical deep guide.

It is an important supportive element with various diameters and sizes. It has implementations with or without anchor.

The iron reinforcement is applied with a concrete system in the holes dug by a bored piling machine. The earth should be studied well while applying and placing this system. In some special circumstances, the sides of the dug hole are pargetted with various chemicals in order to prevent landslides. It is widely used in many building foundation and solid improvement processes.

As Tanyer Construction we have used over 25.000 meters tulle of bored piles (in various diameters) in our projects.