Makina parkımızı incelemek için tıklayınız
COntraCtInG
As Tanyer Yapı, we have been providing quality service by signing branded-name projects in "Ground and Foundation Engineering" applications for 30 years. We deliver the works we undertake at home and abroad on time. We meet all your needs in ground solutions in difficult terrain conditions. We complete the rough construction process meticulously by combining our experience in fine work manufacturing. We work in accordance with international standards and occupational safety rules. All of our projects are constructed with our own expert staff using our own tools and equipment. We aim to work together as your solution partner with our expert engineer staff and powerful machine park.
REFERENCES
- In Altın Vadi Sitesi, the first project of Tanyer Yapı with 88 apartments in Narlıdere region, 4500 m³ of excavation and 2300 m² of retaining wall construction were completed.
- In Altın Ova Sitesi, the second project of Tanyer Yapı with 120 apartments in Narlıdere region, 8700 m³ of excavation and 4250 m² of retaining wall were completed .
- Tanyer Yapı's third project in Narlıdere, in Mavi Su Evleri Sitesi, where 174 flats are located, 1,320 linear meters of 32 passive ground nails, injection concrete, 1,354 m² shotcrete (shotcrete) production, 236 m long 1x1, 20 m. dimensions of the head beam, and a belt beam of 2.078 m in length were manufactured.
- In Asma Bahçeler Sitesi,Tanyer Yapı's fourth project in the Narlıdere region with 94 flats ,Manufacture of 283 12 m long 45 mini piles, Manufacture of 383 18 m long 80 bored piles,Manufacture of 121 pieces of 32 m long 100 bored piles,Manufacture of 98 pieces of 24 m long 100 bored piles under the foundation, 40.156 mt of 32 passive ground nails,Manufacture of injection concrete, 7438 m² shotcrete ,Manufacture of 885 meters long, 1x1 m head beam, A belt beam of 5.358 meters in length and 0.35x0.70 m in dimensions were completed .
- In BulutOrman Evleri Sitesi,The fifth project of Tanyer Yapı in Narlıdere district with 108 flats,Manufacture of 103 22 m long 80 bored piles Manufacture of 137 pieces of 36 m long 100 bored piles,Manufacture of 10.000 m² stone wall, 54.000 m² excavation, Manufacture of 29.904 linear metres 24 m long 32 passive ground nails,Manufacture of injection concrete and 2,451 m shotcret,Manufacture of 270 m long, 1x1 m head beam and Belt beam of 1,307 m length and 0,35x0,70 m dimensions were completed.
- Ground shoring works within the scope New Faculty Building of Koç University Sarıyer Campus , a total of 3.600 linear metres of prestressed anchorage fabrications were made.
- Within the scope of Acıpayam - Çameli - 13th Region Border Road Bridge Footings works , a total of 1,660 linear metres of 100 cm diameter bored pile works were carried out.
- Within the scope of Acıpayam - Çameli - 13th Region Border Road Bridge Footings works atotal of 1,660 metres of 100 cm diameter bored pile works were carried out.
- Within the scope of Under foundation piles of the faculty building constructed in Izmir Katip Çelebi University ,a total of 1,200 linear metres , 100 cm diameter bored piles were manufactured.
- Within the scope of the Construction of Kocaeli bridge crossing , a total of 2,500 metres of bored piles with a diameter of 120 cm were manufactured.
- Within the scope of bridge crossing construction of Konya Metropolitan Municipality , 1,800 linear metres , 100 cm diameter bored piles were manufactured.
- Within the scope of İzmir KORU / Narlıdere project, a total of 3,000 linear metres , 80 cm diameter bored pile, anchorage and shotcrete fabrications were made.
- The slope stabilization work of Narlıdere Hasan İçyer Primary School was done by tender (from the İzmir Governorship YİKOB administration). The production of 566 pieces of 12 m long, 28 passive ground nails + injection concrete and 900 m² shot crete have been completed.
- İzmir Province Menderes District Gümüldür Waste Water Pumping Center Reinforced Concrete Shoring and Jet Grout Construction work was done by tender (from İzmir Metropolitan Municipality İZSU administration). The production of 266 pieces of 25 m long and 80 cm diameter intersecting piles and a total of 4,500 linear metres of jet grout (Jet1) production have been completed.
- For Çanakkale Highway Project, 120cm diameter 4000 linear metres bored piles for viaduct pillar under foundation have been completed. - For the İzmir-Aliağa Petkim refinery, 4800 linear metres of under-foundation bored piles with a diameter of 120 cm were manufactured.
- Excavation, 3000 cubic meters of concrete casting and a total of 800 linear metres of bored piles with a diameter of 100 cm were manufactured for the İzmir/Narlıdere Onag Yapı housing project.
- In İzmir/Uzundere Yenitepe project, 2037 linear metres of retaining foundation piles with a diameter of 120 cm and 560 linear metres of shoring project with a diameter of 100 cm were manufactured.