YOU ARE
ALWAYS COMFORTABLE

Altın Vadi

Project About

Altın Vadi, the foundation of which was laid in 2000 and completed in 2003, is one of the first brand projects of Tanyer Yapı in the region. It consists of 5 blocks and 88 flats. In the project, where each of the houses is located on the land according to the unique sea and mountain view of Narlıdere, the apartments also have a view of the swimming pool or the Izmir bay. Golden Valley; It is one of the first projects that introduced the homeowners in the region with comfort and security standards such as vegetation suitable for the landscape project, automatic lighting and irrigation system, 24-hour private security system, parking lot for 100 cars.

Project Location and Distance

Easy Access to Everywhere
  • Narlıdere Center

    3 km

  • Guzelbahce

    10 km

  • Konak

    10 km

  • Urla

    28 km

  • Alacati/Cesme

    65 km

  • Agora AVM

    6 km

  • Istinye Park

    7 km

  • Dokuz Eylul Hospital

    1 km

  • Highway Connection

    3 km

  • Adnan Menderes Airport

    15 km

  • Ugur College

    3 km

  • Egebil College

    5 km

Altın Vadi

General Information and the Place of the Project

S.S. Altınvadi Land and Residence Construction Cooperative

On the Slope of Narlıdere opposite Fine Arts Faculty

1km away from Dokuz Eylül University Hospital

10km away from Konak Square

15km away from the airport

 

Project Presentation

8.450 square meter of land for usage

5 blocks with 88 flats with a sight of screnery. 2 flats on each floor looks at the swimming pool and Bay of İzmir.

Each flat has a 150square meter of gross and 118 square meter of net usage area.

3 rooms and 1 saloon with laminate flooring.

Master bedroom has a master bath and WC and the floors of the anteroom and kitchen are fitted with first class soil seramic.

Window joineries are of Feniş brand aluminium and heat insulated with double glass.

Plumbing is appropriate for thermal heating.

There is a site management office.

There are 4 flats for doormen.

There are 5 warehouses for the flats.

 

Construction Process

Its construction started in 2000 and after several steps this 5-block project finished in 2003. With the residence permissions all the families moved into their homes.

 

Landscaping

Appropriate flora with the landscape project

Automatic illumination and irrigation for grass fields

The 9x20-meter sized swimming pool is supported an underground water booster.

Security is provided by a private guard system for 24 hours.

There is a parking lot for 100 cars and sheltered sitting areas and a deep well helps out with the gardening needs.

TANYER

OTHER PROJECT